Our Lifts

Stümpfling/Sutten Lifts

Stümpfling chairlift:
Chairlift: quad chairlift, 102 chairs with canopies
Year of construction: 2004
Travel time: 5.5 min.
Speed: 5 m/s
Elevation gain: 365 m
Length: 1,559 m
Uphill capacity: 2,200 people/h
Elevation of bottom station: 1,115 m
Elevation of top station: 1,480 m

Sutten chairlift:
Chairlift: quad chairlift, 124 chairs with canopies
Year of construction: 2005
Travel time: 5.5 min.
Speed: 5 m/s
Elevation gain: 500 m
Length: 2,000 m
Uphill capacity: 2,200 people/h
Elevation of bottom station: 980 m
Elevation of top station: 1,480 m

Roßkopf chairlift
Chairlift: double chairlift, 57 chairs
Year of construction: 2010
Travel time: 2.1 min.
Speed: 1.9 m/s
Elevation gain: 148 m
Length: 353 m
Uphill capacity: 1,068 Personen/h
Elevation of bottom station:  m
Elevation of top station: m

T-bar lifts

Kurven lift
Osthang lift
Nordhang lift
Dreitannen lift
Valeppalm lift
Lyra poma lift

Bayernhang rope tow